UCSF Fire Prevention provides links to the inspection reports conducted by our staff on behalf of the Office of the State Fire Marshal. Most violations are expected to be corrected within 30 days or less. If more time is required, a Plan of Correction must be submitted for approval, specifying the time required for correction and any additional measures that will be put in place to ensure life safety. Please select from the building addresses below to review inspection and any plan of correction, if applicable.
Feel free to email [email protected] with any questions.
Inspection Reports |
Plan of Correction |
Mission Bay |
|
654 Minnesota Street | Plan of Correction |
Parnassus |
|
Mt Zion |
|
2356 Sutter St. MZ Building J | |
All Other Locations |
|
490 Illinois St. Wayne & Gladys Valley Center for Vision |